Abstract

The internationalization of markets and increased sophistication of consumers have led to an increase in the variety and uncertainty of products demand. It spurs the wide use of flexible production systems in producers. In this study, we aim to present a flexible mixed-model assembly line with adjacent workforce cross-training policy to account for this issue. With the adjacent cross-training, the skill of each task can be learned by two workers in adjacent stations and then task reallocation is possible when demand varies. Whenever the production volume or product mix changes, the only modification of the line is shifting some tasks to the adjacent stations where the workers can deal with. In this way, the line can achieve quick response to demand variation with high efficiency without additional trainings or great changes (such as: employment or layoff). The problem is formulated and some important properties are characterized. Then, a branch, bound and remember (BB&R) algorithm is developed to solve the problem. The efficiency and effectiveness of the proposed algorithm and this policy are tested on 450 representative instances, which are randomly generated on the basis of 25 well-known benchmark problems.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call