Abstract
PurposeThis paper considers the assembly line worker assignment and balancing problem of type-2 (ALWABP-2) with fuzzy task times. This problem is an extension of the (simple) SALBP-2 in which task times are worker-dependent and concurrently uncertain. Two criteria are simultaneously considered for minimization, namely, fuzzy cycle time and fuzzy smoothness index.Design/methodology/approachFirst, we show how fuzzy concepts can be used for managing uncertain task times. Then, we present a multiobjective genetic algorithm (MOGA) to solve the problem. MOGA is devoted to the search for Pareto-optimal solutions. For facilitating effective trade-off decision-making, two different MO approaches are implemented and tested within MOGA: a weighted-sum based approach and a Pareto-based approach.FindingsExperiments over a set of fuzzified test problems show the effect of these approaches on the performance of MOGA while verifying its efficiency in terms of both solution and time quality.Originality/valueTo the author’s knowledge, no previous published work in the literature has studied the biobjective assembly line worker assignment and balancing problem of type-2 (ALWABP-2) with fuzzy task times.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.