Abstract
In order to avoid undesirable idling or fuss of the manufacturing resources, the assembly workshop’s scheduler evaluates the effect of different online sequence of parts on production cycle, balances workload and utilization ratio, minimizes span of the assembly line. This paper studies modeling and simulation of assembly line with overlapped and stopped operation, builds mathematical model for the assembly line both under certainty and uncertainty environment. Assembly line problem with these two conditions is simulated, and a simulation prototype system is developed. The assembly line simulation at assembly workshop in an auto company of Beijing validates the effectiveness and correctness of the prototype system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.