Abstract

Baihetan - Jiangsu ± 800kV UHVDC project can improve the power supply stability of the hydropower station, which has very important economic significance. The construction of power transmission projects will affect the water and soil conservation situation along the site. Currently, the commonly used monitoring methods are based on manual data collection with low accuracy and a large workload. Therefore, the government vigorously promotes the development of intelligent water conservancy and strives to improve the digitalization degree of water and soil monitoring systems. In this paper, the traditional chain pin method was improved, using the photosensitive chain pin and ultrasonic chain pin instead of the ordinary chain pin. Then calculated the soil erosion modulus by collecting the soil loss index of the measured point, and uploading it to the cloud for analysis by the radio transmission device, so that the monitor system obtained accurate soil loss data. Finally, the system is applied to the baihetan-Jiangsu soil and water conservation monitoring project, and the monitoring data of soil and water conservation of the two stations are obtained. Combined with the local meteorological conditions, we can analyze the causes of soil and water loss, and give the corresponding prevention measures.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.