Abstract

This work introduces an efficient load scheduling method for handling the day-to-day power supply needs. At peak load times, due to its instabilitythe power generation system fails and as a measure, the load shedding process is followed. The presented method overcomes this problem by scheduling the load based on necessity. For this load scheduling is handled with an artificial neural network (ANN). For the training purpose the backpropagation (BP) algorithm is used. The whole load essential is the input of the neural network (NN). The power generation of all resources and power losses at the instant of transmission is the NN output. The optimum scheduling of different power sources is important when considering all the available sources. Load scheduling shares the feasibility of entire load and losses. It is well-known as optimal scheduling if the constraints such as availability of power, load requirement, cost and power losses are considered. Training the system using a large number of parameters would be a difficult task. So, finest number of communally independent inputs is selected. The presented method aims to lower the power generation expenditure and formulate the power available on demand without alteration. The network is designed using MATLAB.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.