Abstract

The efficiency and accuracy in determining mechanical parameters of joint of rock mass have significant influences on the safety of construction. In this paper, a new back-analysis method of joint parameters of the ubiquitous-joint model is proposed. This study combines the ubiquitous-joint model, random forest algorithm (RF), and cuckoo search algorithm (CS) to construct the parameters identification method of a jointed rock mass. The parameter determination is transformed into a global optimization problem. In this method, the mean square error between the measured displacement (stress) and the calculated displacement (stress) is taken as the objective function, and the joint parameters are taken as the decision variables. The method is applied to the project of Qingniwaqiao Metro Station of Dalian Metro Line 5. This method can be used for the back-analysis of parameters of a jointed rock mass in underground engineering construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.