Abstract

A second rail border crossing between Hong Kong SAR and Mainland China is being constructed. The Kowloon Canton Railway Corporation (KCRC) is constructing the Hong Kong section of the link, the 7.4km Lok Ma Chau Spurline. The design and build contract, 'LBD201 - Sheung Shui to Chau Tau Tunnels' forms part of the Spurline and comprises the design and construction of 3.6km of 8.75m excavated diameter twin bored tunnels and approximately 1.4km of cut-and-cover approach tunnels and associated structures. This paper focuses on the back analysis of the particularly challenging East Approach cut-and-cover tunnels section of the project, which has recently been completed. The results of the back analysis showed the ground stiffness to be consistent with other published data. (A) This paper was presented at Safety in the underground space - Proceedings of the ITA-AITES 2006 World Tunnel Congress and the 32nd ITA General Assembly, Seoul, Korea, 22-27 April 2006. For the covering abstract see ITRD E129148. Reprinted with permission from Elsevier.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.