Abstract

This paper shows the experience of Araz Energy using a Process Bus Solution in four 110 KV (as retrofitted projects) Substations in Azerbaijan. Araz Energy proposal to BEG (Baku Electric Grid that is locally called “Baki Elektrik Shabakasi/BES”) was based on the Hard Fiber Process Bus system made by General Electric-Multilin (as part of General Electric Digital Energy). The use of the Process Bus System is key as it brings all the benefits of a Digital Substation and regular SAS (some vendors call it “DCS” for Substation Automation) and implies changes in the way a traditional substation is being designed, built, serviced and maintained. The experience described in this paper is based on the feedback gained and lessons learned from all perspectives in practice from four different substations where the same concept was applied. Since then the use of Digital Substations has become a landmark in the way Substations should be designed, operated & maintained..

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call