Abstract

Available Transfer Capability (ATC) is a measure for transmission system security margin in open access electricity market. Determining the Available Transfer Capability (ATC) of the transmission networks, Repeated Power Flow (RPF) approach have been used since it can satisfy voltage, thermal and stability constraints among all other methods available. The main objectives include identification of best location for UPFC to get maximum ATC enhancement and to propose a novel method for optimizing the UPFC PV bus location using Generation Shift Factor (GSF) so that power system transmission network can deliver more number of power trades.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.