Abstract
It is noted that deployment of fiber in the loop (FITL) involves more than the simple replacement of copper media with optical fiber; it requires the introduction of additional equipment, primarily related to the optoelectronics obviously necessary for fiber optic transport, and a careful reexamination of maintenance strategies. Although the end-to-end service availability objective (99.99%) is not changed in proposed Bellcore criteria, FITL leads to a new hypothetical reference circuit (HRC) and subsequent reallocation of maximum downtimes assigned to different network elements. These changes are reviewed, and some critical system and component issues are identified. The downtime allocations described, based on the new FITL HRC, give equipment suppliers clear reliability goals for the design and manufacture of their products. >
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.