Abstract
This paper proposes a multiobjective optimization approach for planning railway ballast, rail, and sleeper renewal operations. The objective is to support an informed decision that considers not only the railway track life-cycle cost (LCC) but also the track occupation times required to perform interventions. Two objective functions were minimized, as follows: (1) railway track unavailability caused by railway track maintenance and renewal operations, and (2) railway track components’ LCC. Furthermore, to rationalize the renewal strategy, the model considers a multicomponent formulation that assesses, in time and space, the opportunistic combination of railway track renewal activities. A numerical application of the model on a real case study (Lisbon-Oporto line) is developed and discussed. The results show the interest of using this simple multiobjective optimization approach to obtain a decision-making process to support the scheduling of major railway track renewal works with an informed LCC-unavailability trade-off.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.