Abstract

This article presents a multi-objective (maximization of availability and minimization of maintenance cost) preventive maintenance (PM) scheduling model for a continuous operating series system (COSS) which do not provide an off-working period for PM. The objective functions are optimized by using a Multi-Objective Genetic Algorithm (MOGA). The effectiveness of the model is demonstrated through a coal-fired boiler-tube. The case study shows that the model can improve the availability along with profound reduction of the maintenance cost, i.e., increases the profit of the plant.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.