Abstract

The assembly of products in small lot sizes requires constantly changing and flexible assembly systems. The required process modifications lead to uncertainties in the process quality, which contradict the increasing customer demands on product quality. Inline process monitoring enables a constant process quality to be ensured while maintaining production efficiency. To reduce the effort of manually planning process monitoring, this paper presents an automated approach for generating different planning alternatives. Monitoring requirements that originate from a new product variant are matched with the monitoring skills of an existing assembly system using multiple assignment approaches.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call