Abstract

The power system industry often operates close to its limits to accommodate the increased demand, posing a high risk of blackouts. Power system restoration techniques are utilized post-breakout with the focus on load pickup and speedy recovery. In traditional heuristic methods, the load is considered to be constant after it is picked up. However, from a system operation point of view, the load varies once picked up. This is commonly observed in industrial loads. In industrial systems, loads, which involve many induction motors, are started in sequence. The high starting currents of the induction motors lead to voltage sags that may affect variable speed drives and cause contactors to drop out. If the load variation and inrush currents are not considered, the load will be significantly underestimated at the time of pickup which might lead to a system re-collapse. Besides, one may have to prioritize the loads to help the operator during restoration. An automatic power system restoration tool is developed by using graph theory to provide an efficient restoration path and considers the priority of loads, cold load pickup, inrush currents, and load variation after picking up for a smooth and successful restoration process. Evolution of the smart grid, the intelligent electronic device (IED) has been deployed throughout the power system network for monitoring and control. Therefore, this article takes advantage of the availability of IEDs to report the loads on the feeder right before the system blackout and the real-time load during the system restoration. The industrial system and IEEE 30-bus system are used as test cases to demonstrate the effectiveness of the proposed methodology.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call