Abstract

IN THE MARCUS HOOK AREA, a few miles south of Chester, Pa., the Philadelphia Electric Company supplies a large concentration of industrial load, requiring a high degree of service continuity. Heretofore this load has been supplied directly from the Chester Generating Stations by means of 13.8-kv 3-phase underground cable lines. To provide reliable service, many of the customers in this area have been provided with dual service lines, and in most instances the two lines have been operated in parallel.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.