Abstract

Overall Equipment Effectiveness (OEE), which is commonly used for production performance monitoring, can mislead decision makers with low accuracy when a large amount of losses remains unclassified. This paper is to study the critical factors and potential pitfalls when trying to automatically estimate the OEE of a manufacturing system, considering uncertainty. Two methods based on fuzzy arithmetic and interval arithmetic respectively are proposed to manage the uncertainty in estimating the production speed, the stoppage duration, and the quality losses. Datasets from real-world settings are used to illustrate the concepts and the benefits of the methods in practice.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.