Abstract
Reliable construction project cost estimation relies on accurate quantity takeoffs (QTOs), traditionally done with error-prone 2-D drawings, but the emergence of Building Information Modeling (BIM) has improved QTO speed, accuracy, and reliability. However, the quality of BIM models can influence quantity accuracy, an aspect often overlooked in research on automating QTO with BIM. This paper develops an integrated framework to automatically extract and visualize construction quantities from BIM models. The system includes a Quantity Precision Check (QPC) module for automating more accurate QTO outputs. These outputs are then automatically transferred to an external database and visualized through a user-friendly dashboard on the Microsoft Power BI platform. This dashboard allows for comparisons between 2-D and BIM quantities and helps track changes in quantities over time due to design changes. The system was successfully validated in an infrastructure construction project in Canada, where it identified a 39% inconsistency in wall elements' material quantities and reduced steel quantity by 10% due to design changes. Overall, the system offers a speedy, reliable, and efficient tool for construction estimators, site managers, and cost control teams to provide accurate quantities to the procurement team and make swift decisions in response to design change impacts on construction costs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.