Abstract
The article discusses the issues of construction objects pricing in terms of the formation of certain types of costs and an analysis of their interrelationships based on the generated data bank of design and estimate documentation of implemented state investment construction projects. Special attention is paid to the research of the impact of changes in design solutions on the cost of construction. Approaches to the reorganization of the established design technology are proposed. These approaches use automated identification of construction work and structural elements based on the method for assigning criteria for the selection of building structures that are supposed to be erected around the technological space specified by the customer. The selection criteria established in this way assist designers in finding optimal design solutions for the subsequent development of working documentation.
Highlights
A significant rise of modern computer technology capabilities leads to the trend of increasing the level of automated processes in the design of building objects [1]
The first development of computer-aided design (CAD) systems began after World War II and should control the forces and means of continental air defense
The modern direction of CAD development in the construction industry is the “building information modeling” (BIM) approach, which is based on the use of a single building model and the exchange of information storage about any object by all participants throughout the life cycle of the investment and construction project [3, 4, 5]
Summary
A significant rise of modern computer technology capabilities leads to the trend of increasing the level of automated processes in the design of building objects [1]. BIM technology is not limited to solving problems related to design, and allows management of construction deals with the issues of time organization of the construction process including logistical support, well-timed delivery of construction material, carcasses and goods to warehouses and construction sites [7, 8] and at the operational stage too [9]. Despite these colossal innovations, the conservatism of designers, because of the high standardization of their activities, does not allow the design system to develop in full [10]. It is advisable to automate the proposed model with the existing developments in the automated identification of construction work and structural elements [14, 15]
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.