Abstract

The increasing demand for peaking power has resulted in a greater need for pumped storage power stations. This is particularly so where storage lakes already exist, as pre-construction planning can be avoided and less building is required. In response to this need, Voith Siemens Hydro supplied equipment for the extension of two stations in Austria. However, with each project differing drastically from the other, Voith Siemens Hydro had to access each station individually to determine its independent needs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.