Abstract

The market of domestic Power Plant Generator Protection and Control System (GPCS) is narrow and required the high reliability, and technology. So, it is still operated as turn-key. In recent years, digital relays has evolved into IED can perform the control and monitoring functions without central monitoring based on IEC61850 international standards communications, and attention for advancement of smart grid and ECMS has been increased in South Korea. The increasing attention on multi-function IED, DGPS(digital generator protection system), for internal fault protection of large generator results in starting a national project in South Korea, the IED prototype development for next-generation power units. The voltage restrained overcurrent relay have been used as back-up overcurrent protection for generators. In this paper, voltage restrained overcurrent relay is one of the back-up protective factors in generator protection IED was presented. For evaluation performance of the voltage restrained overcurrent relay, the data of ATPDraw5.7p4 modeling was used. BR

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.