Abstract
TPS (Train Performance Simulation) based on ATO (Automatic Train Operation) is required for driverless LRT (Light Rail Transit) operation plan instead of typical TPS based on driver operation. In this paper, new TPS model using ATO pattern is proposed and compared with the automatic train operation result in a test line of Seoul Metro Line 6 and in a whole line of Busan-Gimhae LRT. The actual ATO pattern can be very accurately simulated by new TPS model with the introduction of 4 parameters such as commercial braking rate, jerk, station stop profile and grade converted distance. The commercial scheduled time for driverless automatic train operation can be proposed to have Fast mode TPS trip time plus 3 seconds/km margin recommended by Korean standard LRT specification in this paper.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.