Abstract

In order to realize the real-time electromagnetic transient simulation of grid-connected photovoltaic power generation system with small time step, a heterogeneous multiplexed parallel real-time simulation method based on field programmable gate array (FPGA) and central processor is studied. According to the simulation accuracy requirements of the high and low frequency decoupling module, a differentiated simulation step size is used to solve the problem, and a 1us/50us FPGA-CPU multi-rate real-time simulation platform is constructed, in which the FPGA simulation part meets the real-time requirements of small-step transient simulation through the optimization of the response matching method and the EMTP algorithm, the offline simulation results are compared with Simulink, and the model before and after optimization is analyzed, the real-time electromagnetic transient simulation results are compared with Simulink, and the model before and after optimization is analyzed. By comparing the offline simulation results with Simulink and analyzing the FPGA resource consumption before and after model optimization, the accuracy and real-time performance of the co-simulation method for real-time simulation of grid-connected photovoltaic systems are verified.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call