Abstract
This paper considers a dam (or storage) model of the GI/G/I type with a finite capacity K. An arriving input being larger than the unfilled capacity of the dam causes an overflow where the excess amount is lost. Important performance measures for this system are the overflow probability and the long-run fraction of input that is lost. We give asymptotic expansions for these measures for large K both for the case of a load factor less than 1 and for the case of a load factor larger than 1. Also, related results are obtained for the impatient customer model of the M/G/l type.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Probability in the Engineering and Informational Sciences
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.