Abstract

In a heap model, solid blocks, or pieces, pile up according to the Tetris game mechanism. An optimal schedule is an infinite sequence of pieces minimizing the asymptotic growth rate of the heap. In a heap model with two pieces, we prove that there always exists an optimal schedule which is balanced, either periodic or Sturmian. We also consider the model where the successive pieces are chosen at random, independently and with some given probabilities. We study the expected growth rate of the heap. For a model with two pieces, the rate is either computed explicitly or given as an infinite series. We show an application for a system of two processes sharing a resource, and we prove that a greedy schedule is not always optimal.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.