Abstract
The bridge of Shanghai Metro Line 10 over Metro Line 6 is a U-shaped concrete single-box double-cell concrete box beam continuous bridge. A novel method is applied to construct the asymmetric cantilever prefabricated and assembled continuous bridge due to the limited construction space and the complex environment. Four mechanical state control methods are applied during the T-shape structure construction process: tensioning pre-stressed steel strand, jacking by the axial force servo system, adjusting the leg reaction force, and setting the auxiliary leg. Auxiliary measures such as the compressive column, side-span counterweight, and temporary pre-stressing are also taken into consideration. The finite element method simulations are performed to measure effects of the four control methods during the construction process. The front leg force of the bridge erection machine and the deflection of the bridge are then monitored. It was deduced that the simulated and measured values of the cantilever T-shape structure are controlled within the limit range during the construction process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.