Abstract

Achieving efficiency success status inside an organization’s built environment and obtaining a positive return on investments need robust and comprehensive asset management and maintenance processes based on the efficiency of contract information documents within the built asset lifecycle. This paper aims to highlight the appropriate interactive approach for construction projects to build the information flow scope of asset facility management contracts based on GIS (Geographical Information System) and BIM (Building Information Modeling) integration processes and sustainability standards, and project as-built contractual documents to support owners and stakeholders with the intent of improving asset management processes. Expert interviews and contract information flow types in several facility management processes conducted in both local and international facility management organizations were used to assist the information flow scope method. The study classified and built significant integrated information and data flow models for a case study to serve as contract guidelines, including efficiency performance measures and indicators for monitoring procedures, technical evaluation, and financial issues in order to provide high-performance service quality in facility management applications.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.