Abstract

ABSTRACT The Government of India has set the target of 60 GW wind energy capacity to be achieved by 2022. The Attributional Life Cycle Assessment methodology and E3-India model are used to study the total economic, energy, and environmental impact of the operational phase of wind turbines across the country. It is expected to generate waste from 2021 until 2051 at the rate of 217.89 tonnes/wind turbine, cumulatively amounting to 7.9 million tonnes. This generates an opportunity for recycling and resale of the metal materials worth USD 4.5 billion, which can be utilized in manufacturing 3.3 GW of wind turbines, thus emphasizing its high circular economy potential. The embodied energy and CO2 emission savings by substituting virgin material are estimated to be 17,215 GWh and 6,626 million tonnes, respectively. Thus, measures like Extended Producer Responsibility could help create a viable circular economy through the partially closed-loop recycling of wind turbines.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.