Some of the main problems in well construction are associated with installation of casing, especially in the overburden. A total of 1,485 lined and open wells, drilled in the hard rocks of the Precambrian basement complex and Palaeozoic sedimentary (Voltaian) formations in northern Ghana were studied. Of these, 500 were directly monitored. It was observed that the surfaces within the production zones of open wells had weathered, leading to silting and reductions in depth and yield, posing physical water-quality challenges. Also, the average life span of the open wells is about 15 years. The fully lined wells, on the other hand, perform very well with time, lasting for over 40 years on average, with a more sustainable physical water quality over their life span. The comparative cost of constructing an open well was found to be about 26% less than that of a lined well due to less construction material requirements. Although open wells may be relatively cheaper than lined wells to construct in hard rocks, the life span is shorter and should not be encouraged for groundwater exploitation especially in community or rural water supply schemes.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.