Abstract
In this study, numerical simulations for winds and waves were carried out using WRF and WW3 and the predicted wind speed, wave height and wave period were validated with measurement. Annual average values of absolute monthly error of wind speed, wave height and wave period were 4.30%, 12.3% and 7.8%. The prediction accuracy were improved by bias modification in the region of low wave height and short wave period. Predicted seasonal frequency distributions showed good agreement with measurements. The criteria of experienced construction methods were investigated at Choshi and Kitakyushu wind farm and the sensitivity of environmental conditions on weather downtime were clarified. At Choshi, the weather downtime was predicted by using wind and wave simulations and showed good agreement with the actual weather downtime.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.