Abstract

This paper presents a GIS-based assessment of the logistics aspects of forestry biomass residues utilization with the prospect of implementing a biomass plant in Alto Alentejo, a region of Portugal. The method follows a cost minimization approach and focuses on the cost calculation of each energy unit generated (in €/MWh), as well as the demonstration of the main economic and financial statements within the project framework. Three municipalities are selected as candidate sites for the biomass plant: Avis, Crato and Portalegre; and the conversion technologies considered are fixed bed combustion (GC/ST), fluidized bed combustion (FBC/ST), and integrated biomass gasification (BIG/CC). Results show that the most suitable municipality for the implementation of a biomass plant is Portalegre, with average electricity production costs of 95, 98 and 133 €/MWh for each considered technology. The assessment also reveals that the power plant configurations studied are financially unattractive due to negative profitabilities. However, sensitivity analysis indicates that good economic performances can be achieved by considering larger biomass plants. Biomass power generation in dedicated plants can be economically sustainable in Alto Alentejo, but may not be the most suitable option for the region taking into account the available biomass potential.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.