Abstract
During the placement of fine-grained cemented mine backfill, the high placement rates and low permeability often result in undrained self-weight loading conditions, when assessed in the conventional manner. However, hydration of the cement in the backfill results in a net volume reduction—the volume of the hydrated cement is less than the combined volume of the cement and water prior to hydration. Though the volume change is small, it occurs in conjunction with the increasing stiffness of the cementing soil matrix, and the result in certain circumstances can be a significant reduction in pore-water pressure as hydration proceeds. In this paper, the implications of this phenomenon in the area of cemented mine backfill are explored. An analytical model is developed to quantify this behaviour under undrained boundary conditions. This model illustrates that the pore-water pressure change is dependent on the amount of volume change associated with the cement hydration, the incremental stiffness change of the soil, and the porosity of the material. Experimental techniques for estimating key characteristics associated with this mechanism are presented. Testing undertaken on two different cement–minefill combinations indicated that the rate of hydration and volumes of water consumed during hydration were unique for each cement–tailings combination, regardless of mix proportions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.