Abstract

The paper analyses geodynamic processes in the development of the Talnakh and Oktyabrsk deposits, which have complex geological structure. It demonstrates the results of the forecast estimation of seismic energy released on the contact surface of the fault plane of type I and II tectonic dislocations when stoping approaches. The article discusses the geodynamic processes occurring during the mining of the Talnakh and Oktyabrsky deposits of complex geological structure. The results of predictive assessments of seismic energy released at the contact surface displacement of a tectonic disturbance type I and II at the approach of remediation. For practical use of the obtained graph of the dependence of critical distance from the front of the treatment works to a tectonic disturbance on the magnitude of the angle of internal friction.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.