Abstract

State-of-the-art approaches to energy aware scheduling can be centralized or decentralized, predictive or reactive, and they can use methods ranging from mathematical programming to agent-based distributed models. In this paper two methodologies are compared for off-line scheduling, for energy intensive manufacturing systems by using a real industrial case, specifically manufacturing by injection moulding. A multi-objective scheduling problem requiring the minimization of the jobs tardiness and energy consumption is faced. A mixed integer programming formulation and a multi-agent approach are proposed and evaluated. Their advantages and drawbacks are pointed out for off-line energy-aware scheduling.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.