Abstract

Abstract. The necessity for developing Hydropower plants a renewable energy source has emerged due to increase in energy demand and environmental concern, as non-renewable sources produce greenhouse gasses. Location analysis methodology for hydropower development has formerly depended upon onsite surveys and manual work which are tedious, time consuming and costly as compared to the work done on GIS environment. In current study an attempt has been made to construct a tool that integrate and automate the various hydrology tools available in QGIS for finding hydro potential site. Each tool perform different function and are linked according to the workflow as majority of these tools uses the output of the previous tool and thus are interdependent. Geoprocessing analysis is performed on DEM to generate fill sink, flow direction, flow accumulation, identification of stream network, head (falling height). Hydrological data (runoff) and Pour point location is taken as input to generate discharge value and watershed contributing to that point location respectively. Finally hydro potential is calculated by the tool and sites having high potential are identified. The model is tested on Hasdo bango hydro power plant site located in Korba district of Chhattisgarh. The hydro potential of the site evaluated from the model is 112 MW which is close to the total installed capacity of the existing hydro power plant of 120 MW.

Highlights

  • The energy demand in India is mainly obtain from Nonrenewable resources, contributing about 64.8% of total energy production (Central Electricity Authority (CEA), 2018)

  • GIS and remote sensing applications were utilized for identifying potential sites within the Hasdeo river catchment area which comes under Korba district of Chhattisgarh

  • The graphical user interface (GUI) is such that it saves only those which are selected by the user in the tool GUI

Read more

Summary

INTRODUCTION

The energy demand in India is mainly obtain from Nonrenewable resources (coal, gas, oil), contributing about 64.8% of total energy production (Central Electricity Authority (CEA), 2018). GIS and remote sensing applications were utilized for identifying potential sites within the Hasdeo river catchment area which comes under Korba district of Chhattisgarh. Important features of catchment like; elevation, rainfall, stream network, watershed delineation, soil, and land use/land cover (LULC) were evaluated and integrated into GIS environment for obtaining potential sites for hydropower installation (Tingneyuc Sekac, 2017). The District's total area is 7,14,544 hectare out of which 2,83,497 hectares is forest land and it is located between 22°01' to 23°01' North and 82°07' to 83°07' East (Fig.). The District's total area is 7,14,544 hectare out of which 2,83,497 hectares is forest land and it is located between 22°01' to 23°01' North and 82°07' to 83°07' East (Fig.1)

METHODOLOGY
RESULTS AND DISCUSSION
CONCLUSION

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.