Abstract

One means of adapting to variation in demand is making capacity flexible so that work in progress (WIP) can be regulated; however, this can significantly influence the dynamic behavior of production networks in which there is high local autonomy. Control-theoretic models are a convenient means for investigating and designing the dynamics of such networks, but the fidelity of these models is not well understood. In this paper, results obtained using discrete-event simulations are used to assess the control-theoretic approach, providing evidence that fidelity varies depending upon factors such as WIP level and the magnitude of capacity adjustments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.