Abstract

Pressurized Heavy water reactor is a horizontal channel type reactor where fuel bundles are inside pressure tubes (PT) and supported at bearing pad locations. Bearing pad (BP) fretting results in formation of volumetric flaws at PT inner surface which may lead to delayed hydride cracking (DHC). In this paper, safety assessment of pressure tube was carried out against DHC initiation at volumetric flaws using CSA N285.8 procedures. Bounding envelop was developed for threshold bulk Heq and volumetric flaw depth for DHC initiation. Several flaw root radius (r) were assumed to arrive at bounding flaw sizes and threshold bulk Heq in the PT. Peak stress was calculated considering hydride ratcheting condition at flaw tip considering sustained hot condition. Four locations, rolled joint inlet/ outlet and PT main body inlet/outlet were selected to assess DHC initiation for volumetric flaws. Residual tensile stress was considered for the assessment at rolled joint location

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.