Abstract

Abstract : This report describes field, laboratory, and computational methods that could be used to assess remedial strategies for abandoned mine drainage (AMD). During April-June, 2004, the assessment process was applied to AMD from bituminous coal deposits at a test site in the Staple Bend Tunnel Unit of Allegheny Portage Railroad National Historic Site (ALPO-SBTU) in Cambria County, Pennsylvania. The purpose of this study was (1) to characterize the AMD quantity and quality within the ALPO-SBTU test site; (2) to evaluate the efficacy of limestone or steel slag for neutralization of the AMD on the basis of reaction-rate measurements; and (3) to identify possible alternatives for passive or active treatment of the AMD. The data from this case study ultimately will be used by the National Park Service (NPS) to develop a site remediation plan. The approach used in this study could be applicable at other sites subject to drainage from abandoned coal or metal mines.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.