Abstract

The paper deals with abandoned former industrial buildings problem and buildings’ redevelopment possibilities with emphasis on sustainable development. A complex decision-making model for redevelopment of abandoned buildings, combining Building Information Modelling (BIM) and Multiple Criteria Decision Making (MCDM) techniques, is proposed. A case study of a former measurement equipment factory is presented. Ranking of possible redevelopment alternatives of the building using Weighted Aggregated Sum Product Assessment method with grey attributes scores (WASPAS-G) is proposed and the most rational projects are selected. While BIM techniques supports an effective selection process and allows implementation of full lifetime management strategy of a project and then of a real object.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call