ABSTRACT In this paper, diggability assessment studies for an electrical rope shovel undertaken in a producing surface lignite mine is presented. For this purpose, a test bench is selected and shovel performance monitoring together with various surveys were carried out on this bench. Manual stopwatch surveys, recording of peak and mean power consumption of the shovel were made before and after blasting. Mass and material properties of the overburden strata were defined, seismic surveys were conducted to measure in-situ P-wave velocities before and after blasting. Bock Quality Indexes were established during blasthole drilling in order to correlated with any local variation in the overburden strata. The accumulated data was analysed in order to examine the efficiency of blasting and its likely effect on the rope shovel performance in terms of production capacity and power consumption. Furthermore a cost analysis is made in order to demonstrate the differentiation of unit handling costs between direct diggi...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.