Abstract

In the Libyan construction industry, the supervising engineer plays an important role in checking time schedules and protecting the client from delays and associated claims but there is no existing means of determining their proficiency in performing this task. A list of factors identifying a broad range of characteristics and skills necessary for the effective supervision of construction projects is compiled. A field survey comprising semi‐structured interviews and questionnaires with 32 client and contractor project managers experienced in the Libyan construction sector is undertaken. The responses are used to develop a method of assessing the effectiveness of supervising engineers in dealing with construction project delays through a set of weighted criteria which are scored according to currently perceived levels of performance. The results indicate that Libyan supervising engineers are currently deficient in a number of areas, particularly communication skills (33%); obtained scientific, technical and legal knowledge (34%); knowledge in dealing with claims (36%); previous experience (37%); knowledge and use of modern techniques (37%). These factors are therefore a key focus for the professional development needs of supervising engineers and the method of assessment should assist clients in the process of selection and appointment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.