Abstract

PurposeThe construction industry is beset with unethical behaviours. Although several studies have investigated the effects of unethical behaviours on project performance, research in the Ghanaian construction industry (GCI) remains scant. Consequently, this research assesses the interactive effects of ethical and unethical behaviours of construction professionals on project performance in the GCI.Design/methodology/approachA quantitative research approach was used to obtain primary data from 68 construction professionals, viz, quantity surveyors, architects, civil engineers, clerk of works and project managers, via a closed-ended questionnaire survey. Data collected were analysed using one-sample t-test and Kruskal–Wallis test statistics, after which two hypotheses were tested and validated using regression analysis.FindingsReduction of project risks, avoidance of legal problems and maximisation project quality performance were critical effects of ethical behaviours observed on project performance, whereas the effects of unethical behaviours such as cost overrun, abandonment and time overrun were severe on project performance in the GCI. Ethical behaviour was seen to relate to project performance positively, and unethical behaviour was proved to have dire consequences on project performance.Practical implicationsConstruction project performance is greatly influenced by professionals' ethical and unethical behaviours. Emergent findings emanating from this research will assist emerging economies in developing and implementing counter policies and systems that mitigate the unethical behaviours of construction professionals.Social implicationsThe study highlights the effects of ethical and unethical behaviours on project performance to reorient individuals' perceptions that unethical behaviours are less critical in the construction industry. Supporting evidence encourages individuals to adhere to ethical behaviours in a project environment.Research limitations/implicationsThe inability to obtain data across the entire geographical spread of Ghana is acknowledged as a major limitation of the study and affects the generalisation of the results.Originality/valueThis study constitutes a first attempt to establish the interactive effects of ethical and unethical behaviours of construction professionals on project performance within the GCI. A significant addition to the body of knowledge is that ethical and unethical behaviours impact project performance positively or negatively, respectively.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.