Abstract

The Bratislava region in Slovakia aims to improve its transport infrastructure by connecting the airport with the railway network. As part of the Trans-European Network for Transport project (TEN-T), an underground railway line is proposed to be constructed on both sides of the Danube River, connecting the airport in Bratislava to the Petržalka region on the river’s right side. However, underground construction is likely to have an impact on the groundwater flow regime. This construction, which will be built below the ground surface, should be built by excavating from above under the protection of sealing walls to prevent significant changes to the groundwater level regime (GWL). Therefore, a numerical model based on the finite element method (FEM) was established to evaluate the effect of the planned underground construction on the GWL, and technical measures were introduced to mitigate any potential impacts. The results of the model revealed possibilities for controlling the groundwater level in the aquifer affected by the railway structure during and after the construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.