Abstract
PurposeThe purpose of this research is to examine the effect of industry clockspeed on the relationship between supply chain management (SCM) practices, from both upstream and downstream sides of the supply chain, and SCM performance.Design/methodology/approachThe study is based on a questionnaire sent to manufacturing companies in the Republic of Ireland. The relationships between the constructs are analysed through regression analysis.FindingsThe results suggest that the relationship between SCM practices and SCM performance is not monotonic across varying levels of industry clockspeed. Although mixed support was found for the hypothesized relationships, this research contributes considerably to the theoretical development of the contingency view in the SCM literature.Practical implicationsManagers should be aware that the rate of change in their industries can affect the way SCM practices across the supply chain impact on SCM performance.Originality/valueThe literature review has shown that empirical studies which address the relationship between SCM practices and SCM performance provide mixed results. One possible explanation lies in the contingency theory. This paper contributes to the theoretical development of the contingency view in the SCM literature by showing that industry clockspeed affects the way SCM practices impact on SCM performance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.