Abstract

The difficulty of dealing with construction and demolition waste (CDW) on construction sites is not new and continues to be an environmental problem. Understanding the waste generated in a construction work is essential to optimize CDW management. Therefore, any tool used for establishing an estimation of the CDW that will be generated should be considered as an alternative to achieve real solutions pursuing sustainability. This paper presents the evolution of CDW flow generation in the construction of new residential buildings, and has identified that the construction activity is increasing the waste generation. In an attempt to find some solutions and provide improved alternatives, several building sites have been analysed in order to quantify the estimation of CDW generated. Results show that when using plasterboard walls the CDW generation, per m2 of built surface can be reduced up to 15.94% compared to the use of traditional brick partitions. In addition, a model describing the accumulation of CDW throughout the project duration is proposed. This model states that CDW mainly accumulates in the middle stages of the project. This study allows an estimation of the amount of CDW to be generated in a building construction site, helping to plan the number and size of containers required at any moment of the construction process, as well as the space required for a proper CDW management.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.