Abstract

Tightening environmental regulations and the signing of the Kyoto Protocol have prompted electric utilities to consider co-firing biomass with coal to reduce the levels of CO 2, SO 2, and NO x in stack emissions. This analysis examines the cost competitiveness of plantation produced woody biomass and waste wood with coal in electricity production. A case study of woody biomass production and co-firing in northern Indiana is presented. A Salix (willow) production budget was created to assess the feasibility of plantation tree production to supply biomass to the utility for fuel blending. Co-firing with waste wood from primary and secondary wood processing activities and local municipalities also is considered. A linear programming model was developed to examine the optimal co-firing blend of coal and biomass while minimizing variable cost, including the cost of ash disposal and material procurement costs. This model was used to examine situations where coal is the primary fuel and waste wood, willow trees, or both are available for fuel blending. The results indicate that co-firing woody biomass is cost-effective for the power plant. Sensitivity analysis explored the effect of waste wood prices on co-firing cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.