Abstract

AbstractThis paper presents the results of a multi‐area generating capacity adequacy assessment performed by the Composite System Reliability Working Group (CSRWG) for the Mid‐Continent Area Power Pool's (MAPP's) United States (US) thermal system. The impact of transmission resource limitations within the MAPP region on the system reserve margin has been studied. In addition, the generating unit forced outage rate uncertainty, extreme hot summer loading conditions and the load forecast uncertainty are explicitly modelled in the study. The basic objective of this study was to determine the Reserve Capacity Obligation (RCO) for the MAPP‐US thermal system for the years 2003, 2006, 2009 and 2012. Similar studies have been performed in 1991 and 1994, and one of the purposes of this study was to determine whether or not the recommendations from the previous studies were still valid. The results of the study confirmed the current RCO level for the MAPP‐US thermal system. Copyright © 2007 John Wiley & Sons, Ltd.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.