Abstract

The purpose of this paper was to assess the use of process protocol to analyse and identify the key sequential phases and documentation of the management processes of labour-based works in order to achieve a successful project and process execution. In order to achieve the above aim, a literature review of conference papers, reports, available project documents and limited interviews to officials involved in public works programmes were conducted. The analysis showed that there are seven phases with various deliverables spanning from phase zero to phase six. There are three most common operational levels of the management processes and these are subdivided into national level, integrated local level and project level. The process protocol-based phases consider the whole life cycle of a construction project while integrating the process elements under a common framework. Best practices in management of labour-based works have been used to follow and synthesise the process protocol approach to the management processes of labour-based works.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.