Abstract
BackgroundThe Minimal Clinically Important Difference (MCID) assesses what change on a measurement tool can be considered minimal clinically relevant. Although the recall period can influence questionnaire scores, it is unclear if it influences the MCID. This study is the first to examine longitudinally the impact of the recall period of an anchor question and its design on the MCID of COPD health status tools using the COPD Assessment Test (CAT), Clinical COPD Questionnaire (CCQ) and the St. George’s Respiratory Questionnaire (SGRQ).MethodsModerate to very severe COPD patients without respiratory co-morbidities were recruited during 3-week Pulmonary Rehabilitation (PR). CAT, CCQ and SGRQ were completed at baseline, discharge, 3, 6, 9 and 12 months. A 15-point Global Rating of Change scale (GRC) was completed at each follow-up. A five-point GRC was used as second anchor at 12 months. Mean change scores of a subset of patients indicating a minimal improvement on each of the anchor questions were considered the MCID. The MCID estimates over different time periods were compared with one another by evaluating the degree of overlap of Confidence Intervals (CI) adjusted for dependency.ResultsIn total 451 patients were included (57.9 ± 6.6 years, 65% male, 50/39/11% GOLD II/III/IV), of which 309 completed follow-up. Baseline health status scores were 20.2 ± 7.3 (CAT), 2.9 ± 1.2 (CCQ) and 50.7 ± 17.3 (SGRQ). MCID estimates for improvement ranged − 3.1 to − 1.4 for CAT, − 0.6 to − 0.3 for CCQ, and − 10.3 to − 7.6 for SGRQ. Absolute higher – though not significant – MCIDs were observed for CAT and CCQ directly after PR. Significantly absolute lower MCID estimates were observed for CAT (difference − 1.4: CI -2.3 to − 0.5) and CCQ (difference − 0.2: CI -0.3 to −0.1) using a five-point GRC.ConclusionsThe recall period of a 15-point anchor question seemed to have limited impact on the MCID for improvement of CAT, CCQ and SGRQ during PR; although a 3-week MCID estimate directly after PR might lead to absolute higher values. However, the design of the anchor question was likely to influence the MCID of CAT and CCQ.Trial registrationRIMTCORE trial #DRKS00004609 and #12107 (Ethik-Kommission der Bayerischen Landesärztekammer).
Highlights
The Minimal Clinically Important Difference (MCID) assesses what change on a measurement tool can be considered minimal clinically relevant
Summary of main findings This study found no systematic significant differences between various recall periods of a 15-point anchor question on the MCID for improvement of the Chronic obstructive pulmonary disease (COPD) health status tools COPD Assessment Test (CAT), Clinical COPD Questionnaire (CCQ) and St. George’s Respiratory Questionnaire (SGRQ) in a Pulmonary Rehabilitation (PR) setting
The assessment of change compared with the start of PR, the expected stability of COPD symptoms over time after PR and the use of the optimal recall period might help explain why this study found stable MCID estimates during follow-up
Summary
The Minimal Clinically Important Difference (MCID) assesses what change on a measurement tool can be considered minimal clinically relevant. This study is the first to examine longitudinally the impact of the recall period of an anchor question and its design on the MCID of COPD health status tools using the COPD Assessment Test (CAT), Clinical COPD Questionnaire (CCQ) and the St. George’s Respiratory Questionnaire (SGRQ). Determining treatment effects requires a parameter that assesses to what extent change on a health status tool can be considered clinically relevant. The Minimal Clinically Important Difference (MCID) is used to evaluate this It has been defined as “the smallest difference in score, which patients perceive as beneficial and which would mandate a change in the patient’s management” [5]. Observed change should exceed the estimated MCID value in order to be clinically relevant
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have