Abstract

It is not a trivial issue how to manage assembly blocks at a shipyard. Based on the project experience in Hyundai Heavy Industries, currently the largest shipbuilding company in the world and the leader in the Korean merchant shipbuilding industry, this study points out the difficulties on the block stockyard operations, formalises the assembly block storage location assignment problem, and develops the assembly block storage location assignment algorithm, the purpose of which is to reduce the number of unproductive block moves. Through simulation experiments for various situations, this study demonstrates the usefulness of the assembly block storage location assignment algorithm. In addition, this study examines the impacts of block move sequence rules and of block stockyard layouts on the block stockyard operations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.