Abstract
During the late 1980s, the Washington State Department of Transportation (WSDOT), the University of Washington, and the Washington State Transportation Center developed a mechanistic-empirical flexible overlay design procedure. Following development, WSDOT implemented this overlay design procedure and has been evaluating flexible overlay projects for approximately the past 8 years. WSDOT rehabilitates about 100 projects each year; approximately 20 to 30 percent of the total projects are designed using the WSDOT overlay design procedure and the AASHTO overlay design procedure (using DARWin). These two procedures are discussed in general, and two case studies illustrate each of the overlay design procedures. Also included is the backcalculation of layer moduli from falling weight deflectometer data.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transportation Research Record: Journal of the Transportation Research Board
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.